⚠️ If there are several missions on the project, you must select the mission before clicking on the variable.
"Surface" {{ surface_area_variable|fee_project:1 }} takes the information filled in from the fees tab > area.
"Costs of the work" {{ construction_cost_variable|fee_project:1 }} summarizes the information filled in from the fees > costs of the work tab.
"Cost per square meter" {{ cost_per_surface_unit_variable|fee_project:1 }} summarizes the information filled in from the fees tab > cost per square meter.
"Basic production fees" {{ base_production_fees_variable|fee_project:1 }} summarizes the information filled in from the fees tab > cost per square meter.
"Pourcentage Honoraires FF&E" {{ default_fee_pct_variable|fee_project:1 }} resumes the information filled from the fees tab > FF&E if the module is activated.
"Production discount" {{ production_discount_variable|fee_project:1 }} retrieves the information filled in from the fees tab > Discount (in euros)
"Discount %" {{ default_discount_pct_variable|fee_project:1 }} retrieves the information filled in from the fees tab > Remise (en pourcentage)
"Fees per square meter" {{ fees_per_surface_unit_variable|fee_project:1 }} summarizes the information filled in from fees > fees per square meter.
"Percentage down payment" {{ advance_payment_pct_variable|fee_project:1 }} summarizes the information filled in from the fees tab > Down payment (in percent) if populated from the module.
"Advance payment" {{ advance_payment_variable|fee_project:1 }} includes the information filled in from the fees tab > Advance payment (in euros) if provided from the module.


