Skip to main content

The variables : FEES category

Updated this week

⚠️ If there are several missions on the project, you must select the mission before clicking on the variable.

dynamic content

  • "Surface" {{ surface_area_variable|fee_project:1 }} takes the information filled in from the fees tab > area.

  • "Costs of the work" {{ construction_cost_variable|fee_project:1 }} summarizes the information filled in from the fees > costs of the work tab.

  • "Cost per square meter" {{ cost_per_surface_unit_variable|fee_project:1 }} summarizes the information filled in from the fees tab > cost per square meter.

  • "Basic production fees" {{ base_production_fees_variable|fee_project:1 }} summarizes the information filled in from the fees tab > cost per square meter.

  • "Pourcentage Honoraires FF&E" {{ default_fee_pct_variable|fee_project:1 }} resumes the information filled from the fees tab > FF&E if the module is activated.

  • "Production discount" {{ production_discount_variable|fee_project:1 }} retrieves the information filled in from the fees tab > Discount (in euros)

  • "Discount %" {{ default_discount_pct_variable|fee_project:1 }} retrieves the information filled in from the fees tab > Remise (en pourcentage)

  • "Fees per square meter" {{ fees_per_surface_unit_variable|fee_project:1 }} summarizes the information filled in from fees > fees per square meter.

  • "Percentage down payment" {{ advance_payment_pct_variable|fee_project:1 }} summarizes the information filled in from the fees tab > Down payment (in percent) if populated from the module.

  • "Advance payment" {{ advance_payment_variable|fee_project:1 }} includes the information filled in from the fees tab > Advance payment (in euros) if provided from the module.

dynamic content
Did this answer your question?